Styro Stone Floor System

includes:

The special advantage: Delivery 'Just in Time'. The floor blocks are delivered along with the styro stones for the walls. The beams within 14 days after order.

That means, no trouble with delays, which could delay the whole construction.

What you don't need.:

  1. No exttra transportation of props to and from the construction site.
  2. No shuttering, no loss of shutter material
  3. 130 m² floor surface are done with 2 men in 8 hours, meaning 7 Min./m². Time saving!
  4. No extra thermal insulation before laying the screed.
* Special beams for unusual floor constructions might not be included, only V-tec beams.


continuar Construtores - Pisos - Tipo 2 - Certificação